Skip Navigation
Planning Center of Expertise for
Inland Navigation
Feedback
-
Site Map
-
Printable Version
-
Search
Home
Location
Mission Summary
Who We Are
Organization Expertise
Library
Links of Interest
Presentations
Publications
Inland Nav Community of Practice (CoP)
Peer Review Plans
Model Certification
Charter
Home
>
Library
>
Studies
Navigation Studies
Gallipolis L/D Facility Study
1985
Monongahela River Ls/Ds 7&8 Feasibility
1984
Development of Transportation Rate Data for the ORS
1984, 92, 95, 97, 99, 00, 03
Forecast of Future Ohio River Basin Traffic
1985, 90, 95, 97, 98, 02
Locks and Dams No. 52 and 53 (Olmsted L/D) Feasability
1985
Winfield L/D Feasibility
1986
Wabash River Navigation Recon
1987
McAlpine L/D Feasibility
1988
Upper Tennessee River Recon
1988 - 1991
Drought Impact Study
1989
Kentucky River Recon
1989
Green River Navigation Recon
1990
Meldahl and Racine L/D Closure Study
1990
Winfield Traffic Management Study
1990
Olmsted L/D Benefit Update
1990
Lock Maintenance Closure Study
1990
Ohio River Navigation System Report
1990, 92, 94, 96, 99
Great Lakes and Ohio River Navigation System Report
2002
Ohio River Navigation System Statistical Supplement
1991, 93, 95, 97, 00
Kentucky L/D Feasibility
1991
Upper Ohio Progress Report
1991
Big Sandy Dredging Report
1991, 93, 97
Elk River Dredging Report
1991, 93, 97
Lower Monongahela River Feasibility
1991
Marmet Locks and Dam Feasibility Study
1993
Green River Phase I Feasability
1993
Kentucky L/D LRR
1993
ORS Lock Capacities Update
1994
Lower Mon PED Update
1994
McAlpine L/D PED Update
1994
Uniontown (Myers) L/D Feasibility
1993-1994
Ohio River Mainstem System Study
1995-2003
Myers/Greenup Interim Feasibility Report
2000
Kentucky Lock Limited Reevaluation Report
1995
Marmet L/D PED Update
1996
London L/D Rehab
1997
Soo Locks LRR Economics Update Appendix
1997-2002
Lower CU and TN Rivers Traffic Mgt Study
1997-98
Chicago L/D Rehab
1998-99
WAM Shallow Draft Users Manual
1999
Indiana Harbor ITR
1999
Modal Impacts - Ohio River Basin
1999-2000
Modal Impacts - Great Lakes
2001
Commodity, State, Project & Congressional Profiles
1999-2003
Chickamauga Locks and Dam Feasibility Report
2002
Great Lakes Navigation Review, Recon. Report
2001-2002
Kanawha River System Study
2000-2003
Lower Monongahela Update ITR
2002
Ohio River Navigation Invest. Model (ORNIM) Dev.
1998-2004
Great Lakes Levels Analysis Model (GLLAST)
2001-2002
Waukegan Harbor CDMP ITR
2003
Work for Others
Institute for Water Resources
Comparison of General Equilibrium and Tow Cost Models (1985)
Tow Cost Model Manual (1983, 1986)
Navigation Profiles (2001-2002)
Waterborne Commerce Statistics (1985-2003)
Government of Pakistan
Indus River Recon (1985)
West Virginia
Inland Waterway Commerce (1988)
Kentucky
Inland Waterway Commerce (1988)
Ohio
Inland Waterway Commerce (1989)
Commodity Flow Study (2001)
Charleston District
Cooper-Santee Waterway (1989)
Navigation White Paper (1989)
Georgetown Harbor Dredging (1991)
Port of Charleston Simulation Model (1998-99)
AIWW Economics Appendix, Myrtle Beach (1998-99)
AIWW Economics Appendix, South Carolina (2000-2002)
Little Rock District
Montgomery Point Plan Formulation Assistance (1989)
Arkansas River Feasibility, Phase 1 ITR (2003)
Tulsa District, Arkansas River Feasibility, Phase 2 (2003)
HQUSACE
National Waterway Investment Study Participant (1990-93)
Niger and Benue Rivers, Nigeria, Navigation Study Proposal (2001)
Oak Ridge National Laboratory
Panama Canal WAM Model (1993)
WAM Deep Draft Manual Users (1993)
Government of Paraquay
Hidrovia Paraquay-Parana (1994)
Government of Germany
Seine-Moselle Canal Proposal (1995)
Government of France
Seine-Moselle Canal Proposal (1995)
Detriot District
Sault-Ste. Marie Locks (1995-1996)
ORSANCO
HTW Site Inventory and Tracking System (1996)
Panama Canal Commission
Panama Canal Operations and Maintenance Study (1995-96)
Panama Canal Concepts Only for New Lock Designs and Alternatives Study (1997)
TVA
Upper Tennessee River Feasibility (1991-1993)
Jacksonville District
Port Everglades Simulation Model (2001-2003)
Tampa Bay Harbor Simulation Model (2004)
Rock Island District
Upper Miss./Ill. Waterway Economic Model ITR (1998)
Upper Miss./Ill. Waterway Rate Analysis ITR (1998)
POC PCXIN
(304) 399-5635
PCXIN@usace.army.mil
Login
Last Updated: May 12, 2010
Back to Top